Prefab Factory Office

Prefab Factory Office

The prefab factory office can quickly meet the temporary office needs, isolate the noise and dust in the industrial environment, and the internal layout and functions can be adjusted at a low cost. Moreover, they have low requirements for the foundation and do not affect the original production facilities.
Send Inquiry
Chat Now
Description
Technical Parameters
prefab factory office
  • Customized sizes and designs

 

The prefab factory office can quickly meet the temporary office needs, isolate the noise and dust in the industrial environment, and the internal layout and functions can be adjusted at a low cost. Moreover, they have low requirements for the foundation and do not affect the original production facilities.

 

Advantages of the prefab factory office

Quick response to temporary office needs

It can be used as a temporary or mobile office space. It can be quickly installed through modular assembly without complex approval procedures. Moreover, it can be moved or dismantled as needed in the future without occupying the factory's fixed production land.

"Isolated adaptation" in industrial environments

It can be independently built beside the factory production area, being close to the production site for easy communication while also isolating machine noise and dust, providing a relatively comfortable environment for office workers and balancing "production collaboration" and "office experience".

Low-cost functional iteration capability

The internal layout can be adjusted quickly. When upgrading office equipment later, there is no need for large-scale wall renovations, reducing the time and cost of functional upgrades.

Lightweight infrastructure burden

It has low requirements for the foundation, does not affect the structural safety of the existing production facilities, and does not occupy the factory's valuable floor area ratio indicators.

product-1098-601

 

Our completed cases

 

Case 1: Gemma Great Mosque of Diyarbakir, Algeria

 

product-1135-493

 

Case 2: Large resort project in Nassau, Bahamas

 

product-1132-433

 

Case 3: Verana International Airport project, Maldives

 

product-1119-442

 

Case 4: Expansion of the Ivorian port of Abidjan

 

product-1120-514

 

Case 5: Villa in Zambia

 

product-1098-489

 

Production process

 

product-999-700product-1002-705

 

Package and delivery

 

product-1107-547

 

FAQ

Q: What's your delivery time?

A: Normally the delivery time is as follows: Prefab houses: 20-25 days, container houses: 15-20 days, steel structure houses: 25-30 days, Villas: 30-35 days.

Q: What's your package?

A:For different houses we have different ways of package. Some are in flat pack, some are folded in containers (main structure and panels in bulk, door, ceiling, floor tiles,furniture in cartons, sanitary, electrical, plumbing, hardware, fittings, tools in wooden cases), some we can ship the whole house.

Q: What are your payment terms?

A: We prefer T/T 50% deposit, balanced before shipment, 100% irrevocable L/C at sight, or pay through other third party. For big projects, other payment terms can be discussed by both party.

Q: What kind of technical drawings can you provide?

A: We can provide 3D drawings, pictures, blueprint for foundation, plumbing, electric system, installation, furniture etc.

Hot Tags: prefab factory office, China prefab factory office manufacturers, suppliers, factory, fold out container, container cabin office, portable container cabin, portable shipping container homes, single shipping container home, prefab shipping container homes